A Jefferson family took their thirty-year-old main bathroom and kitchen down to the studs — and brought us in at the rough-in stage, the right moment to get everything right behind the walls before anything gets sealed behind tile.
Scope of Work
- Re-routed supply lines in PEX-A with home-run manifolds — better pressure balance and isolation than the original trunk-and-branch copper
- New drainage for a relocated kitchen island, including an in-floor branch to the stack with proper venting
- Bathroom rough-in: tub, vanity and toilet flanges set to the finished-floor drawings, not guesswork
- Fixture installation phase: freestanding tub filler, wall-mount vanity faucets, kitchen pot-filler — the finishes the renovation was built around
- Full pressure test and camera check of every new drainage branch before close-in, documented for the homeowner's files
Why One Team Matters
Renovation plumbing fails at handoffs — the rough-in crew and the finish crew who never meet are how fixtures end up misaligned with tile and shut-offs end up behind cabinets. One licensed team from rough-in to final test means one accountable name on the 1-year workmanship warranty. The project's contractor called us back for the basement bathroom before the paint was dry upstairs.
Project details
- 🛠 Category: Installation
- 📍 Location: Jefferson, Richmond Hill
- 🗓 Completed: 2026-03
- ✅ Warranty: Written 1-year workmanship warranty on every job
- 📝 Pricing: Flat-rate, quoted in writing before work began



